webleads-tracker

Home  >  ADVANCED PACKAGING  > EV Group unveils next-gen temporary bonding & debonding ...
  >  ADVANCED PACKAGING
Jul 17th, 2012
 
EV Group unveils next-gen temporary bonding & debonding platform for 3DIC HVM
 
EV Group (EVG), a leading supplier of wafer bonding and lithography equipment for the MEMS, nanotechnology and semiconductor markets, today introduced the EVG®850TB/DB automated temporary bonding and debonding system built on the company's new XT Frame platform, which has been optimized to support thin-wafer processing for high-volume 3D IC and TSV (through silicon via) manufacturing.
Send to a friend
EVG850 TB/DB tool (XT Frame)
EVG850 TB/DB tool (XT Frame)

A combination of hardware and software design enhancements enables double the processing throughput over EVG's previous-generation, industry-benchmark platform to up to 40 stacks per hour. The new XT Frame-configured EVG850TB/DB is designed for EV Group's open materials platform approach, which enables the use of a wide range of adhesives from various materials suppliers. This approach provides customers with the most flexible choice of bonding materials supporting ZoneBOND™ and other technologies-and is key to achieving high process throughput, repeatability and yields for 3D IC manufacturing.

"Temporary bonding and debonding of device wafers to wafer carriers for thin-wafer processing are critical steps to enabling the successful integration and implementation of 3D ICs into high-volume production," stated Dr. Thorsten Matthias, Business Development Director, EV Group. "To this end, advances in wafer bonding are necessary to support the efforts of early 3D IC/TSV adopters as they move ever-closer to attaining this goal. Our new XT Frame-configured EVG850TB/DB builds upon our core expertise to provide production-ready solutions for our customers to facilitate their rapid ramp from development and integration to high-volume manufacturing. It is designed from the ground up to enable the highest productivity and yields in thin-wafer processing."

Built on the company's new XT Frame platform, the EVG850TB/DB is capable of accommodating up to nine process modules, doubling the previous maximum processing capability of EVG's temporary bonding and debonding systems.  The new XT Frame design enables highly efficient continuous mode operation (zero idle time) capability via an ultra-fast handling system, up to four FOUP (front opening unified pod) load ports, and a material buffer in the form of a local FOUP storage system that holds up to 10 additional FOUPs.  The platform also features an in-line metrology module option to enable real-time monitoring of the bonding/debonding process-enabling maximum yields and helping to lower production costs for thin-wafer processing.  In addition, the EVG850TB/DB has been qualified for all bonding and debonding methods, including low temperature debonding methods like ZoneBOND™ technology with EZR® (Edge Zone Release) and EZD® (Edge Zone Debond) modules.

The EVG850TB/DB built on the new XT Frame platform is now available for shipping.  EV Group has provided leading-edge temporary bonding and debonding solutions for 15 years-and is the first to provide its high-volume manufacturing customers with a TB/DB solution for around-the-clock operation. 

 

 
More ADVANCED PACKAGING news

Jul 23rd
Jul 22nd
Jul 21st
Jul 16th
Jul 12th
 
©2007 Yole Developpement All rights reserved                  Disclaimer | Legal notice | To advertise
Yole Développement: Le Quartz, 75 cours Emile Zola, 69100 Villeurbanne, France. TEL: (33) 472 83 01 80 FAX: (33) 472 83 01 83 E-Mail: info @yole.fr