|
|||||||||||||||||
![]() Click HERE to download COWIN’s presentation |
Home
> ADVANCED PACKAGING
> Mid end equipment performance to be evaluated through ...
> ADVANCED PACKAGING
Jan 18th, 2012
Mid end equipment performance to be evaluated through SEMATECH's programs
To enable high-volume production readiness of 3D-based products, SEMATECH’s 3D Interconnect and Manufacturability programs will be conducting Equipment Maturity Assessments (EMAs) of several critical 3D tools during 2012 to establish functional equipment capabilities and address high volume manufacturing maturity issues. The assessment is a cooperative effort among experts from SEMATECH’s 3D program, ISMI’s EMA team, and the supplier.
3D integration is introducing several new process steps primarily on the wafer backside and between chip makers fab processes and packaging. These include temporary bonding to handle wafers, wafer thinning, through-silicon via (TSV) reveal, re-distribution layers (RDL), wafer or die bonding, and wafer release. Compared to existing fab tools, these new processes and the accompanying tools are relatively immature and need a comprehensive understanding of tool performances to prepare for high volume manufacturing (HVM). Sources :
More ADVANCED PACKAGING news May 21st
May 15th
May 11th
May 10th
May 10th
|
||||||||||||||||
©2007 Yole Developpement All rights reserved Disclaimer | Legal notice | To advertise
Yole Développement: Le Quartz, 75 cours Emile Zola, 69100 Villeurbanne, France. TEL: (33) 472 83 01 80 FAX: (33) 472 83 01 83 E-Mail: info @yole.fr |
|||||||||||||||||